Penmann recently finalised a tailored HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a fully engineered ventilation and climate control system designed to satisfy demanding hygiene and production standards. The scope included the end-to-end implementation of cutting-edge HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://socialfactories.com/story6178727/the-penmann-team-finalises-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2