Yet another note: the popular serpentine path towards the Salzberg will continue being closed right up until the top of the construction get the job done. Design perform will start on 1 September 2025 and can past until early summer season 2026. Through this time, the salt mine (salt mine) https://robertr407twx5.oneworldwiki.com/user