1

Product

News Discuss 
The DTT tokamak. whose construction is starting in Frascati (Italy). will be equipped with an ECRH system of 16 MW for the first operation phase and with a total of 32 gyrotrons (170 GHz. ≥ 1 MW. https://www.campicon.com/

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story