Use wooden stakes and Mason’s line or chalk line to create a square or rectangular condition round the marked area. Be certain the formwork is stage and protected. While developing the formwork, make allowance for the slope in the direction of the middle with the drain. Adhering to these guidelines https://roofdrain33085.aioblogs.com/84376931/details-fiction-and-roof-drain